Product Description
These finials were I beleive produced in conjunction with the new pre cast concrete signal posts in the G.W.Rs concrete factory at Taunton in 1924. Severn Beach had at least 6 of the new post installed in 1924. The reason for this 2 sided version was to allow for east fitting to concrete posts as these posts could not be modified when cast, They did in up on many wood post signals too. This example is in a nice repainted condition.